The Pinellas County Comprehensive Plan is subject to periodic evaluation and amendment,
as allowed and required by the State of Florida, in order to ensure that the plan
remains an effective long-range planning tool for the county, and at a minimum, address
changes in local conditions as well as any new state planning requirements. In order
to achieve this, the comprehensive plan, as referenced in this article, shall be the
plan as originally adopted in 1989 and amended through subsequent amendment cycles,
including the 2008, and any succeeding, evaluation and appraisal report-based amendments,
as prescribed by the Florida States Statutes pertaining to comprehensive planning.
(Ord. No.
18-36
, § 3(Att. A), 10-23-18)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');